Major In-Unit Alterations

Owners may renovate, improve, or alter their units, provided that such renovation does not disturb or remove any structural or load-bearing wall within your unit.

Prior approval for any renovation, alteration, or improvement must be obtained from the Board of Directors of the Association.

To get this approval, owners should provide their plans in writing to the Board of Directors, at least 60 days in advance of their renovation so that the Board has time to consider their plans at a regular board meeting.

Additionally, if the renovations will require alterations to electrical, water, sewer, or gas utilities, owners must obtain the proper permits from Fairfax County.

Laundry Facilities

Laundry facilities are provided on the terrace level as a concession by a laundry vendor. Washers and dryers are NOT ALLOWED IN INDIVIDUAL UNITS.

To report a malfunction of a washer or dryer, first call the vendor at the number listed on the machines, then notify the site office using the Action Request Form in the laundry room. It is important to leave the washers clean and to remove any lint buildup in the lint trap of the dryer each time you use it.

DO NOT OVERLOAD THE MACHINES. Trying to save $2 could end up costing $200 in repairs or cleanup. When in doubt, divide your load!

Our Staff

Kelly Dillon
Rick Russell
Talltree South
This email address is being protected from spambots. You need JavaScript enabled to view it.

Kelly YoungKelly Young
CMCA, AMS

Cardinal Management Group